Back to catalog
Utility Infrastructure
H01 pHostInfo Unit
Utility infrastructure tests for pHostInfo. These cases verify deterministic host reporting, MOOSDB port publication, and exact pShare route normalization for valid, multi-route, mixed, non-UDP, and invalid route specifications.
Stem Mission
Baseline scenario context
The stem mission runs a single shoreside MOOS community with pHostInfo, uTimerScript, pAutoPoke, and pMissionEval. Case overlays change only pHostInfo configuration and mission-owned host-info pass/fail conditions.
Examples
Representative runs
These pHostInfo GIFs are generated explanatory views instead of raw pMarineViewer captures because the meaningful evidence is host-info MOOS mail, not map geometry. The visuals call out the evidence that makes each case pass.